Morning Report |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
1. |
Date: Friday, December 3,2004 |
| |
8:57 AM |
2. |
Peak Load for Thursday, December 2,2004 hour ending 18 was 18840 MW. |
| |
|
|
|
|
|
|
|
|
| 3. |
Operable Capacity Analysis (MW): |
| |
A. Installed Generating Capacity |
|
|
|
|
|
|
32,888 |
| |
B. Capacity Additions EcoMax Bid > SCC |
|
|
|
|
|
|
268 |
| |
C. Pre-OP4 Dispatchable Loads |
|
|
|
|
|
|
0 |
| |
D. Generation Outages and Reductions |
|
|
|
|
|
|
2,742 |
| |
E. Generation Unavailable Due to Start Time |
|
|
|
|
|
8,210 |
| |
F. Capacity Deliveries: Net Purchases = (-) Net Sales = (+) |
| |
|
NYISO AC ties |
|
|
-8 |
|
|
|
| |
|
NYISO Cross Sound Cable |
|
|
0 |
|
|
|
| |
|
NB |
|
|
-100 |
|
|
|
| |
|
TransEnergie |
|
|
-1,417 |
|
|
|
| |
|
Net Deliveries |
|
|
|
|
|
-1,525 |
| |
G. Total Available Capacity (A+B+C-D-E-F) |
|
|
|
|
|
|
23,729 |
| |
H. Peak Load Forecast for hour 18 |
|
|
|
|
|
|
18,875 |
| |
I. Total Operating Reserve Requirement |
|
|
|
|
|
|
1,800 |
| |
J. Capacity Required |
|
|
|
|
|
|
20,675 |
| |
K. Surplus = (+) Deficiency = (-) (G - J) |
|
|
|
|
|
|
3,054 |
| |
|
|
|
|
|
|
|
|
| |
L. Replacement Reserve Requirement |
|
|
|
|
|
|
300 |
| |
|
|
|
|
|
|
|
|
| |
M. Excess Commitment Surplus = (+) Deficiency = (-) (K-L) |
|
|
|
|
|
|
2,754 |
| |
|
|
|
|
|
|
|
|
4. |
Largest First Contingency: PHASE 2 at 1200 MW |
| |
|
|
5. |
A.M.S. Peak Load Exposure: 20995 MW |
| |
|
|
| 6. |
Reserve Summary (MW) |
|
| |
Ten Minute Reserve Requirement: |
1,200 |
| |
Ten Minute Reserve Estimate: |
1,200 |
| |
Thirty Minute Reserve Requirement: |
600 |
| |
Thirty Minute Reserve Estimate: |
3,654 |
| |
Expected ICU Operation: |
- |
| |
Expected Actions of OP 4: |
- |
| |
Additional Capacity Available from OP 4 Actions: |
- |
| |
|
|
| 7. |
Interchange Summary (MW) |
| |
|
|
|
Transfer Limit |
|
|
Scheduled Contracts |
|
NYISO AC Ties |
|
|
-1400 |
|
|
-8 |
|
NYISO Cross Sound |
|
|
0 |
|
|
0 |
|
NB |
|
|
-700 |
|
|
-100 |
|
TransEnergie |
|
|
-2218 |
|
|
-1454 |
| |
|
|
|
|
|
|
|
| 8. |
Weather Forecast Summary for the Peak Hour |
| |
|
|
|
Conditions |
|
|
Wind |
|
|
High Temp (°F) |
|
Boston: |
|
|
SHOWERS |
|
|
W-10 |
|
|
37 |
|
Hartford: |
|
|
SHOWERS |
|
|
W-10 |
|
|
40 |
| |
|
|
|
|
|
|
|
|
|
|
9. |
NYISO SAR Available: Yes |
| |
|
10. |
Capacity of Noncommercial Units that are Testing: 0 MW |
| |
|
11. |
Units committed to meet minimum replacement reserve: 0 units totaling 0 MW |
| |
|
| 12. |
Solar Magnetic Disturbance Activity |
| |
Forecast: |
| |
Alert: |
| |
Intensity: |
| |
Observed SMD Activity: |
| |
|
| |
SMD Actions Taken or Planned by ISO NE: |
| |
|
| |
SMD Actions Taken or Planned by other Control Areas: |
| |
|
|
|